2016-12-2 in and export |
バルブセットが済みましたので吸排気ポートの穴あけをしました。
I set the valve guide, then open the intake and exhaust port.
Set on the fixture and drill the hole and tap for fixing the flange of the pipe. |
そのポートをあけるための固定具です。 Intake and exhaust port is slant 5 degree for the axis of the cylinder center line so cylinder head was fixed on the fixture for this purpose. |
set on the fixture |
Find the center with Laser finder |
First drill with 3mm tungsten carbide drill |
If drill with normal drill, drill tip will cut the center portion before it penetrate the outer wall of the valve guide.. |
これでも完全に貫通するまで開けると中心に一部食い込んでしまいますので一歩手前までで止めます。 I used endmill but still using it, it will cut the center portion. So I stopped before it. |
これでポートは一応完了です。 Finally I grind the residual portion by motor tool. |