Lee Hodgson 9 Radial Index
2009-4-1
drawings and material
2009-5-1
crankcase
2009-5-20
endmill sharpener
2009-6-1
front cover
2009-6-16
front & rear bearing housing
2009-7-2
jack shaft and retainer
2009-7-10
coolant system on the lathe
2009-7-16
cam ring
2009-9-7
crank shaft FAILED!
2009-9-14
recovered but not satisfie
d
2009-9-28
crank shaft retry
2009-10-14
tool holders
2009-11-5
hand launch glider
2009-12-8
cylinder head
interim repor
t
2009-12-22
cylinder head
interim report 2
2010-1-22
cylinder head
2010-2-22
valve
2010-3-23
valve springs ect
2010-4-12
CNC foam cutter
2010-4-27
wing cut
2010-5-25
oil pump
2010-6-25
master and slave rod
2010-7-28
hand launch glider No.2
2010-8-25
hand launch glider No.2
completed
2010-9-25
cylinder
2010-10-25
hand launch glider
4 main wings
2010-11-25
miscellaneous
2010-12-21
piston
2011-1-14
piston ring
2011-2-25
hand launch glider
Super Gee 2
2011-3-5
fixation
2011-4-5
Super Gee 2
2011-4-15
rocker box
2011-5-9
micro SAL glider
2011-5-20
rocker boxes
2011-6-11
rocker arm etc
2011-6-25
rear cover
2011-7-2
Bill Coles' Bentley BR2
2011-7-26
distributor
2011-9-1
tappet and tappet guide
2011-9-15
push rod and
impeller
2011-10-05
transfer pipe
2011-10-18
intake and exhaust pipe
trial piece
2011-11-05
intake and exhaust pipe
part1
2011-11-11
intake and exhaust pipe
part 2
2011-11-22
intake and exhaust pipe
completed
2011-12-13
engine mount No.1
2012-01-10
engine mount No.2
2012-01-21
incredible
2012-02-01
retainer plates
2012-02-15
oil sump
2012-02-25
tool for grinding
the valve seat cutter
2012-03-05
valve check
2012-3-15
valve-3
2012-03-23
valve-4
2012-03-30
assemble-1
2012-4-6
assemble-2
2012-4-12
assemble-3
2012-4-19
trouble shooting-1
2012-4-27
recovery shot
2012-5-15
trouble shooting-2
2012-5-28
devastating damage
2012-6-12
test run
2012-6-22
break in
2012-7-10
for perfect running
2012-7-23
for perfect running 2
2012-8-10
about my arrangement
2012-9-25
float chamber
oil control valve
2012-10-25
engine mount
2012-12-4
fine adjustment
2012-12-15
fuel and oil tank
2013-1-8
plug cap
2013-1-16
completed
2013-2-15
heat exchanger
2013-2-26
repair again
2013-3-19
new crankshaft
2013-3-29
final assemble